Start at the right device.
A planned QR entry point connects a physical asset to its identity, history, and assigned work.
QR navigation · plannedThe work happens in the field. The record should, too. Bring electrical testing, equipment details, and maintenance evidence into one connected workflow.
Vacuum circuit breaker
A collection workflow that asks for the details a paper form can miss.
Designed to distinguish a local save from an internal database confirmation.
Retained locally during a service interruption.
Awaiting the internal connector.
Confirmed after the internal database commit.
Paper gets the job done—until a value is missing, a photo lives on another phone, or someone has to type it all again. GridShepard starts where that friction starts.
A planned QR entry point connects a physical asset to its identity, history, and assigned work.
QR navigation · plannedStructured readings, explicit reasons for omissions, instrument details, and supporting evidence.
Field forms · prototypeAn outbound connector brings records into GridSentinel and returns a distinct database receipt.
Connector · prototypeFrom the first measurement to the next maintenance cycle, the equipment stays at the center.
One reading at a time. Large controls. A numerical entry workflow that can be evaluated with an external keypad.
Glove, iPad, and keypad use require field validation.Capture as-found and as-left readings, procedure references, calibration details, conditions, and findings. Missing information becomes visible before submission.
Available in the local prototypeLocal drafts and a frozen submission queue support interruptions. Clear delivery states distinguish device storage, cloud acceptance, and an internal database commit.
Prototype · real-device testing pendingAttach supporting photos and reports to the record, rather than reconstructing the story later from separate messages and files.
Attachments in the local prototypeThe product direction brings equipment QR navigation, outstanding issues, maintenance assignments, and switching documents into the same workspace.
Planned product directionThe proposed cloud inbox waits for GridSentinel’s connector to initiate outbound HTTPS. It does not need an inbound route to your internal database.
Start with a defined pilotQueued metadata and evidence do enter cloud storage. Classification, access, retention, and any applicable NERC CIP requirements need a separate deployment review. No compliance status is implied.
Start with a small, approved equipment set and learn from the people doing the work.